A-Y Well in Libya
Through optimized bit selection, drilling parameters, and on-site decision-making, the well achieved efficient drilling under complex conditions. ROP met or exceeded design targets in all sections, NPT was controlled at 2.6%, active operation time reached 81%, and the well was completed in 24.48 days, demonstrating Brilliant's technical strength and execution capability in complex oilfield operations.