A-Z Well in Libya

Through refined drilling parameter optimization and on-site management, the well achieved significant rate improvement while ensuring wellbore integrity. ROP in all sections substantially exceeded design targets, NPT was controlled at 2.2%, active operation time reached 86.3%, and the well was completed in just 16.94 days, fully demonstrating Brilliant's technical advantages in efficient drilling.

Region
Libya
Service
Drilling Tools and Services
Published

Background

The well was spud on July 4, 2026. The planned total depth was 5,431 ft, with an actual total depth of 5,451 ft.

Challenge

The operation required completing all sections from 26" surface casing to 9-5/8" intermediate casing in complex formations, while controlling non-productive time and ensuring wellbore stability.

Solution

By optimizing bit selection and drilling parameters, developing section-specific rate improvement plans, and strengthening on-site operation management, drilling efficiency was effectively enhanced.

Results

Actual ROP exceeded design targets in all sections, with 50 ft/hr in the 17-1/2" section (plan: 36 ft/hr) and 46 ft/hr in the 12-1/4" section (plan: 35 ft/hr). NPT was only 2.2%, with active operation time at 86.3%. The well was completed in 16.94 days, demonstrating exceptional drilling efficiency.

Results & Metrics

A-Z Well in Libya
A-Z Well in Libya

A-Z Well in Libya

Project Gallery

Related Services

01

Drilling Tools and Services

Provide integrated drilling solutions covering drilling bits, downhole motors, drilling tools, and technical support. Through reliable equipment, responsive field services, and application-focused expertise, we help clients improve drilling efficiency, control operational risks, and achieve safer, more cost-effective well construction.