Background
- Single run
- Result after inspection: No any damages
- 37% increase in ROP compared with the off-set run
- Reduced 9.3 days and saved up to 150,000 USD

In the Jiaoshi Shale, the operator successfully drilled the entire 3,675 feet interval in a single run with an ROP of 32.7 ft/h.

01
High-performance PDC bit and downhole motor solutions delivering higher ROP, stable directional control, and reduced drilling cost.
View service