High-Torque Demanding Drilling Record: Shale Gas

In the Jiaoshi Shale, the operator successfully drilled the entire 3,675 feet interval in a single run with an ROP of 32.7 ft/h.

Region
Jiaoshi Shale
Service
Drilling Tools and Services
Published

Background

  • Single run
  • Result after inspection: No any damages
  • 37% increase in ROP compared with the off-set run
  • Reduced 9.3 days and saved up to 150,000 USD

Solution

  • Single run
  • Result after inspection: No any damages
  • 37% increase in ROP compared with the off-set run
  • Reduced 9.3 days and saved up to 150,000 USD

Results

  • Single run
  • Result after inspection: No any damages
  • 37% increase in ROP compared with the off-set run
  • Reduced 9.3 days and saved up to 150,000 USD

Results & Metrics

Footage
3,675ft
Total Hours
113hrs
ROP
32.7ft/h
Reported Time Reduction
9.3days
Reported Savings
150,000USD, up to

Related Services